BLUE LINK
Home · Kitchen renovation electrician · Kitchen renovation electrical checklist
Kitchen renovation planning guide

Kitchen Renovation Electrical Checklist

A kitchen renovation has more electrical decisions than most people expect before the tradesperson even arrives: cooking appliance circuits, dishwasher and other appliance connections, lighting layout, power point placement around benches, and switchboard capacity for it all combined. Planning this upfront avoids costly changes mid-renovation.

See our two-visit electrical schedule for how we typically sequence kitchen renovation electrical work.

Blue Link Electrical Services is a NSW licensed electrical contractor (licence 332956C), based in Marrickville, working on kitchen renovations across Sydney since 2016. Call 0421 772 661 early in your planning, not after cabinetry is ordered.

Licensed & insured
  • Licensed electrician, NSW 332956C
  • Working across Sydney since 2016

Appliance circuits to plan for

Lighting and power layout

Under-cabinet lighting, pendant positions over an island, downlight layout for general illumination, and power point placement around the bench (including USB outlets if wanted) are all decisions better made before cabinetry and benchtops are finalised — moving a power point after benchtops are installed is a much bigger job than planning it upfront.

Switchboard capacity

Adding several new dedicated circuits (cooktop, oven, dishwasher) at once can reveal an older switchboard doesn't have enough spare capacity — worth checking early in planning, not discovering during the renovation itself. See why switchboards run out of space.

Frequently asked questions

When should I involve an electrician in kitchen renovation planning?

As early as possible, ideally before cabinetry and appliance orders are finalised — changes become more disruptive and expensive the later they're identified.

Do I need to choose appliances before the electrical plan is finalised?

Helpful if possible, since specific appliance ratings affect circuit sizing — but we can plan with reasonable assumptions if appliance choices aren't locked in yet.

How many visits does kitchen renovation electrical work typically need?

Often two — a rough-in stage and a fit-off stage — see our two-visit schedule guide.

Does a kitchen renovation always need switchboard work?

Not always — depends on existing capacity and the scope of new appliances and circuits being added.

Need a licensed electrician?

0421 772 661

Blue Link Electrical Services · NSW licence 332956C · since 2016 · fully insured · 24/7 emergency

Blue Link Electrical Services · Marrickville NSW 2204 · 0421 772 661 · bluelinkelectrical.com.au

Call 0421 772 661