Short answer: Solar often needs space, protection and clear labelling in the switchboard. In an older Sydney home the board may already be full or outdated, so an upgrade is planned with the solar installer. We upgrade boards; we do not design or install the solar system itself.
Many Sydney homes looking at solar discover that the switchboard needs work before, or as part of, the installation. Solar adds new equipment and new load paths to a board that may already be old, full, or short on safety-switch protection. This guide explains what an electrician looks at, what a solar installer usually handles, and how the two jobs fit together.
Blue Link Electrical Services upgrades switchboards and prepares them for new loads. We are not a solar retailer and we do not pretend to design or install photovoltaic systems. Use a Solar Accreditation Australia (SAA) accredited designer for the solar design and an SAA-accredited, licensed installer for installation. For systems claiming small-scale technology certificates, check that they hold current SAA accreditation for the relevant design and installation work. We work alongside that installer when the board itself needs to be brought up to a suitable standard.
Why the switchboard comes up at all
A rooftop solar system connects into the home’s electrical installation. That usually means space in the switchboard for the solar supply, correct protection and labelling, and a board that can accept the extra equipment without leaving you short of ways for everyday circuits. If you also plan a battery, an EV charger or an induction cooktop, the board has to make sense for the whole picture, not only the panels.
In Inner West terraces and older houses it is common to find ceramic fuses, a single safety switch, a crowded board, or a layout that cannot take another circuit cleanly. Those issues matter even without solar. Solar simply makes them harder to ignore. Our signs you need a switchboard upgrade guide covers the usual warning signs, and switchboard upgrades in Sydney explains the service itself.
What we check on the board
When a homeowner or a solar installer asks us to look at a board ahead of solar, we typically check:
- the condition and age of the board, including fuse types and any signs of heat or damage
- whether there are spare ways, or whether a new or larger board is needed
- safety-switch protection on the existing circuits, and how a board replacement would be used to bring that up to date
- whether the proposed solar connection point is practical and can be labelled clearly
- other planned loads, such as a charger or a cooktop, so the board is not upgraded twice
Some older boards also sit on a backing panel that may contain asbestos. If that is a possibility, the upgrade has to be planned around safe handling and, where required, a licensed asbestos removalist. See our notes in the related switchboard guides, and do not drill or break a suspect board yourself.
What sits with the solar installer
The solar design, the panels, the inverter, the rooftop and inverter isolators, and the application to the network are the solar installer’s job. In NSW, solar installation is specialised work and should be done by an appropriately accredited installer. If the job also involves the meter or the service equipment, that can require an Accredited Service Provider. We do not offer that service, and we will tell you when it is needed so the right people are involved.
The cleanest projects are the ones where the board is assessed early, not after the inverter is already on the wall and there is nowhere sensible to terminate it.
All-electric plans and solar together
Solar is often part of a wider move off gas: induction cooking, a heat-pump hot water unit, and sometimes an EV charger. Each of those can need its own circuit and a board that can take them. If that is your plan, it is worth saying so up front. Upgrading the switchboard once, with space and protection for the loads you already intend to add, is usually better than a narrow solar-only change followed by another upgrade a year later. Our page on switchboards for an all-electric home covers that wider brief, and Inner West switchboard upgrades covers the local work.
What you should get at the end
Switchboard work is electrical work. It should be tested, and you should receive a uniquely numbered Certificate of Compliance for Electrical Work. Keep that with any solar documentation the installer provides. If you live in a strata scheme, confirm any owners corporation approvals before work starts, because some equipment sits on common property.
If a solar quote has already been issued, send us the pages that show the inverter size and the proposed board connection. If safely accessible, include a photo of the visible switches and labels through the ordinary access door, leaving all protective covers in place. Do not remove or unscrew any panel, touch wiring or disturb a suspect asbestos board. We can inspect anything that is not safely visible, and can then tell you whether the board can accept that connection, or whether an upgrade should be booked before the installer sets a date. A photo of any warning sticker that is already visible in the meter box is also useful, because some older boards need asbestos-related planning as well as electrical work.
Homeowners in Marrickville, Newtown, Ashfield, Glebe and nearby suburbs often have tight switchboard cupboards and limited wall space. That does not prevent an upgrade, but it does affect the enclosure we specify and how the solar installer routes the inverter cable. It is better to measure that once, together, than to discover the clash on installation day.
Blue Link Electrical Services is a licensed contractor, NSW licence 332956C, working across Sydney with the Inner West as a priority, 24/7. If you want the board assessed before solar, or upgraded so it is ready, contact us or call 0421 772 661.
Want your switchboard assessed before solar? Get a quote or call 0421 772 661.
Frequently asked questions
Does every solar install need a new switchboard?
No. Some boards already have space, suitable protection and a practical connection point. Many older boards do not. The board should be checked early, not after the inverter is already on the wall.
Do you install the solar panels as well?
No. We upgrade and prepare switchboards. Use a Solar Accreditation Australia (SAA) accredited designer and an SAA-accredited, licensed installer for the solar system. We work alongside that installer when the board needs attention.
Can I upgrade the board for solar, a charger and induction at once?
Yes, and that is often the better brief. If you already plan those loads, the board can be laid out for them in one upgrade rather than being revisited later.
Will I get a compliance certificate?
Yes. Switchboard work should be tested and you should receive a uniquely numbered Certificate of Compliance for Electrical Work. Keep it with your solar documents.