The Zappi from myenergi is popular with EV owners who want control, with its own app, charging modes, timers and load management. We install Zappi chargers across the Inner West and Sydney.
Ring 0421 772 661 for a written quote. Photos of your switchboard and where you park help us quote accurately.
A Zappi is a wall-mounted home EV charger. Like any hard-wired charger, it needs its own circuit from the switchboard, sized to the charger and protected properly, and a cable route to wherever the car parks. If you live in the Inner West, close to our Hurlstone Park base, see our page on EV charger installation in the Inner West.
What makes the Zappi different is how much you can control. You can charge at full speed, set timers for off-peak rates and boost when you need to, all from the myenergi app. To manage charging around the rest of the house, it measures power drawn from the grid, so the installation includes a current clamp (CT) at the switchboard or meter box.
Blue Link Electrical is a licensed electrician based in Hurlstone Park (NSW Contractor Licence 332956C). We check your switchboard and supply first, install the circuit and charger, set up the CT clamps, and test everything before we leave.
Zappi chargers come in single-phase and three-phase versions, and as tethered (with a fixed cable) or untethered (you plug in your own cable). Most Inner West homes are single-phase, which suits the single-phase model. If your property already has three-phase power, the three-phase version can charge faster, but only if your car's onboard charger supports it. Check the exact model and its installation manual before buying.
If you want load management, the CT clamp position matters as much as the charger itself. Placing it correctly at the grid connection is what lets the Zappi tell how much the house is drawing. We plan this at the quote stage, especially in older homes where the meter box and switchboard are in different places.
The charger runs on its own circuit from the switchboard, with cable sized for the charger's current and the length of the run.
There needs to be room for a new circuit with suitable protection. Older ceramic fuse boards usually need an upgrade first.
A home charger draws heavy current for hours. We check what else runs at the same time, such as air conditioning, an oven or a heat pump, so the supply isn't overloaded.
For load management and monitoring, a CT clamp is fitted at the grid connection and linked back to the charger.
Close to where the car parks, protected from knocks, with the cable able to reach the car's charge port comfortably.
App control and remote monitoring need the charger connected via the myenergi hub or network setup. It's not needed for basic charging.
1. Quote. We look at your switchboard, meter box and parking spot, then give you a written quote. Photos are often enough to start.
2. Circuit and charger. We run the dedicated circuit, fit the protection at the switchboard, mount the Zappi and connect it to the manufacturer's installation instructions.
3. CT clamps and settings. We fit and position the CT clamps for load management, then check the charger reads grid import correctly. We'll show you the charging modes.
4. Test and certify. The circuit is tested to AS/NZS 3000 and you receive a Certificate of Compliance for Electrical Work. Our recent EV charger job in Lilyfield shows a typical neat garage installation.
Often a timer or mode setting, or a CT clamp in the wrong position or reading the wrong direction. See Zappi not charging.
Can point to a wiring fault, the wrong type of protection, or a fault in the charger or car. See Zappi tripping the safety switch.
Charging while big appliances run can overload an older supply. Load management settings or a switchboard upgrade fix it.
Usually a Wi-Fi or hub issue rather than an electrical fault. Charging can still work without it.
Detailed troubleshooting:
Yes. Set a timer in the myenergi app or on the charger and it charges in that window. Load management also needs correctly installed CT clamps.
No. Most Inner West homes are single-phase and use the single-phase Zappi. Three-phase only helps if your property already has it and your car can use it.
Often, but older boards may need an upgrade first. We check the board, supply and other big loads before we quote.
Yes. Send us the model details and we'll quote the installation. We install and wire the charger; product warranty is handled by the manufacturer.
Yes. Blue Link Electrical holds NSW Electrical Contractor Licence 332956C, is fully insured, and issues a Certificate of Compliance for the installation.
NSW Electrical Contractor Licence 332956C · Fully insured · Since 2016 · Based in Hurlstone Park
Excellent electrician Blue Link Electrical was honest, knowledgeable, and took the time to answer my questions The work was completed quickly without rushing and everything works perfectly Will be using them
Very professional and reliable service. Blue Link Electrical were punctual, friendly, and knew exactly what they were doing. The job was completed to a high standard and the place was left clean. Highly recommend to anyone needing electrical work.
Can't fault the service from Blue Link Electrical From first contact to job completion everything was smooth and professional Quality workmanship and great attention to detail. One of the best trades experiences I've had. Make sure you do them slowly
Shown in full, as written on our Google Business Profiles.
Send us a few details and we'll get back to you with a clear, upfront quote.