Bought an EV, or about to? We install home chargers across the Inner West, and check first that your switchboard and supply can handle it.
Ring 0421 772 661 for a written quote.
Plenty of Inner West homes are older terraces and cottages with small switchboards and single-phase supply. A 7 kW charger draws a lot of current for hours at a time, so the first job is checking your switchboard, cabling and supply can handle it alongside everything else in the house.
Many terraces have no off-street parking. A home charger needs somewhere off the street to park, like a garage, carport or driveway. If your setup won't work, we will tell you honestly before you spend money.
In an apartment or townhouse? Read EV charging in NSW strata first.
Room for a new circuit, and modern protection.
Single or three-phase, and what else runs at the same time.
The neatest, safest path from the board to the charger.
Where you park, and how the cable reaches the car.
Some chargers can slow down when the house is busy.
Smart chargers can be set to charge on off-peak rates.
1. Quote. Send photos of your switchboard and parking spot, or we inspect, then quote in writing.
2. Install. A dedicated circuit with the right protection, run neatly to the charger.
3. Set up and test. We test the circuit and the charger and show you how it works.
4. Paperwork. A Certificate of Compliance for Electrical Work for the installation.
Any brand, any car. Bring the charger you have chosen, or ask us to help: see how to choose a home EV charger. Whatever you drive, the charger goes on its own circuit with the protection the maker specifies, and we set up the app and charging schedule with you before we leave.
Chargers we install:
Charging guides by car brand:
The price depends on the charger, the distance from the switchboard, and whether the switchboard needs work first. You get a written quote before any work starts.
For typical ranges, read our EV charger installation cost guide.
We install EV chargers across Marrickville, Dulwich Hill, Petersham, Stanmore, Newtown, Enmore, Ashfield, Summer Hill, Croydon, Croydon Park, Leichhardt, Annandale, Lilyfield, Rozelle, Balmain, Glebe, Camperdown, Hurlstone Park, Canterbury, Ashbury, Haberfield, Tempe, Sydenham and St Peters, plus Five Dock, Drummoyne, Abbotsford, Concord, Burwood and Strathfield.
Every street is a little different. In the terraces of Newtown, Enmore and Balmain, the charger usually goes in a rear-lane garage or carport, so the main job is the cable route from a hallway switchboard. Federation homes in Haberfield, Summer Hill and Ashfield more often have a side driveway with room for a wall-mounted unit. Larger houses in Concord and Strathfield sometimes suit two chargers or three-phase supply, while apartment garages in Drummoyne and Abbotsford Cove go through the owners corporation first. If the switchboard has no room, our Inner West switchboard upgrades come first.
Suburbs with their own EV charger page:
Across the 13 Inner West suburbs we have local pages for, motor vehicles per dwelling ranged from 0.9 in Newtown to 1.7 in Croydon Park; the share of flats and apartments ranged from 24% in Croydon Park to 69.9% in Ashfield at the 2021 Census (ABS QuickStats). Suburbs with more apartments and fewer cars per home tend to need strata approval for chargers, while house-heavy suburbs more often have a driveway or garage to work with.
Often, but not always. Older boards may need an upgrade first. We check before we quote.
No. Most homes charge happily on single-phase. Three-phase allows faster charging if your car and charger support it.
Yes. We install it on its own circuit with the right protection, and test it before we leave.
Usually, but you will need the owners corporation involved. Our strata EV charging guide explains how it works in NSW.
Most smart chargers can. Tell us your setup and we will recommend a suitable option.
Yes. We install any brand, including Tesla Wall Connector, Zappi, Wallbox, Easee, Evnex and Ocular, and we check the model suits your switchboard and supply before we quote.
Usually, yes. We plan a cable route from the switchboard to the garage, and if the board has no room we upgrade it first.
If the service line or meter has to change, that is level 1 and 2 work arranged through accredited partners, and we coordinate it with the charger installation.
Yes. NSW Electrical Contractor Licence 332956C, fully insured.
NSW Electrical Contractor Licence 332956C · Fully insured · Since 2016 · Based in Marrickville, working across the Inner West
Downlight Installation in Marrickville
Kitchen LED Strip Lighting in Marrickville
Switchboard Upgrade in MarrickvilleExcellent electrician Blue Link Electrical was honest, knowledgeable, and took the time to answer my questions The work was completed quickly without rushing and everything works perfectly Will be using them
Very professional and reliable service. Blue Link Electrical were punctual, friendly, and knew exactly what they were doing. The job was completed to a high standard and the place was left clean. Highly recommend to anyone needing electrical work.
Can't fault the service from Blue Link Electrical From first contact to job completion everything was smooth and professional Quality workmanship and great attention to detail. One of the best trades experiences I've had. Make sure you do them slowly
Shown in full, as written on our Google Business Profiles.
Send us a few details and we'll get back to you with a clear, upfront quote.